functx:total-days-from-duration
The total number of days in a dayTimeDuration
Description
The functx:total-days-from-duration function returns the total number of days in $duration. If it is an uneven number of days, it will return a fractional part. This function is different from the built-in fn:days-from-duration function because the latter will not return a fractional part. If $duration is the empty sequence, the empty sequence is returned.
Parameters |
Description |
---|---|
duration:time() |
the duration |
Examples
XPath |
Results |
---|---|
functx:total-days-from-duration(xs:dayTimeDuration(‘PT24H’)) |
1 |
functx:total-days-from-duration(xs:dayTimeDuration(‘P1D’)) |
1 |
functx:total-days-from-duration(xs:dayTimeDuration(‘PT36H’)) |
1.5 |
functx:total-days-from-duration(xs:dayTimeDuration(‘PT48H’)) |
2 |